Menu

Equipments

Concreting
Sr. No. Name of Equipments No. of Machines
1 Concrete Batching and Mixing Plant 3 Nos.
2 Cement Silo 100 Tons
3 SCADA Software with PWD Site Integration 1 Nos.
4 Schwing Stetter make Concrete Pump
a) Model 1200
b) Model BP 350

2 Nos.
1 Nos.
5 Concrete Mixers
a) 10/7
b) 14/10 Reversible
c) 7/5

20 Nos
4 Nos
4 Nos.
6 Concrete Surface Vibrator unit make Greaves
a) Disel Vibrator
b) Electrical Vibrator

10 Nos.
4 Nos.
7 Concrete Needle Vibrator with all Diameters
a) 60 mm
b) 40 mm
c) 25 mm

10 Nos.
10 Nos.
10 Nos.
8 Mini Crane 500 kgs Capacity 2 Nos.
9 Concrete Testing realted Material like
a) Cube testing machine - 1000 KN
b) Cube moulds
c) Sieves Sets
d) Slumps Cones

3 Nos.
100 Nos.
10 Nos.
10 Nos.
10 Weigh Batches 5 Nos.
11 Concrete Demolishing Hammer 5 Nos.
12 Bar Cutting Machine 5 Nos.
13 Wood Cutter and Planning Machine 25 Nos.
14 Hoist 10 Nos.
15 Re Baring Machine 15 Nos.
16 Drill Machine 20 Nos.
17 Generator 2 Nos.
Transport Vehicles
Sr. No. Name of quipments No. of Machines
1 Mahindra Tractor with Dumping Trolley 1 Nos.
2 TATA Truck 1 Nos.
3 JCB 1 Nos.
Temporary Structures
We have a perfabricated MS pipe Shed to cater for storage purpose of various material like cement godawn etc., with GI sheet for roofing to temperary construct at least 10 structures with an area of 300 sq.ft. each in additional hutting facilities for up 2000 labours can be temorary create on any worksite
Surveying Instruments
For regular site use we have 7 sets of dumpy levels, aluminium leveling staffs etc., We have also our own theodolite. Any other surveying instrument are produced as and when required.
1. Dumpy Level - 10 Nos.
2. Auto Level - 10 Nos.
3 Aluminium Staffs - 15 Nos.
4 Theodolite - 8 Nos.
5. In addition/any other surveying instruments are procured as and when required.
RCC Formwork material
1. MS Centering Plates - 11000 Nos.
2. All other wooden related material for formwork of slabs, beam, columns including plywood form, stell form of certain sizes, prop, bracing mild steel clamps, wooden members etc., to cater for simultaneous shuttering work of least two building with individual area of about 50000 sq.ft. excess material as per site requirements can be produced by new purchase or through our piece workers having their own materials. 3. Props - 11000 Nos. 4. Spans - 2500 Nos. 5. Structural Steel for slab stagging work